Inauguration of the 110/20kV Substation Kombinat, Tirana
November 2020 | Posted by EnBi Power
EnBi Power, in collaboration with Jacobsen Elektro, successfully delivered the 110/20 kV Kombinat Substation in Tirana.
This is a project funded by The World Bank, which is considered as a major step in the improvement of the energy sector in Albania. This investment will supply with electricity approximately 120,000 residents in the Kombinat neighborhood of Tirana. The Substation offers a high technology, reducing the energy losses from 17% to 5%. The Substation is under control and monitoring through the implementation of a SCADA System.
Further Technical Specifications include:
- Installed Power: 2×40 (50 MVA)
- Medium Voltage Line Bay: 20kV 25 Fiders
- Level Voltage: 110/20kV
- High voltage primary equipment supplied by General Electric
- Medium voltage equipment supplied by Schneider Group
- Control and Protection release supplied by SIEMENS
- TLC and RTU supplied by ABB
- Power Transformers supplied by JSB